How To Install Shell Scheme Booth?

Publish Time: 2017-02-13     Origin: Site

Shell Scheme Booth Installation Process:

  • connect beam(950mm) and post(2480mm) with tool.

  • put the pvc panel between the beams and post(2480mm) with 3 tension lock.

  • Do not forget install the adjustable foot under the post.

  • connect the pvc panels one by one.

  • install the sign panel, and the booth is finished.